Cost Code List Only Cost Analysis Report

The Cost Code List Only Job Cost Analysis Report is a report which shows only the cost code and description, as well as the name and number of the assigned Vendor or Subcontractor.

This report is accessible through Job Costing Analysis Reports. To print this report, check the Cost Code List Only radio button under the Report Formatting tab.

Report Description - Cost Code List Only Job Cost Analysis Report

Heading

The report heading consists of the report title, date, page number and company name. The limits set at the time of printing are also included.

Cost Code

This is the cost code or job phase. Following the code number is the code type (Labor, Materials, Subcontracts, Equipment or General). If a grouping code is assigned, the code is printed behind the code type.

Description

This column contains the name or description of the cost code for the job phase listed.

Vendor / Subcontractor

This column gives the name and number of the Vendor or Subcontractor assigned to this code.

Report Sample - Cost Code List Only Job Cost Analysis Report